Well flowed at stabilised rate from the C1 sand, and Strike’s flow testing has confirmed a low-impurity gas accumulation.
Flow rate since TD has increased to over 320 thousand cubic feet per day ("Mcfd") Projected stabilised flow rates are 350 Mcfd to 450 Mcfd, constrained to optimise production, with a maximum potential ...
My Alerts is a service for subscribers. Please login or subscribe in order to use My Alerts. Flow tests at the Sockeye-2 exploration well in Alaska’s North Slope were successful, a joint venture ...